BIM Project Execution Planning Guide

BIM Software; BIM Manager; BIM Koordinator; BIM Schulung; BIM Management; BIM Events

Latest Version of the BEP Guide & Templates – Version 2.2 (2019)

The button below will take you to the latest compiled version of the BEP Guide (Version 2.2).  This version is the first version published in the PressBooks platform as an online document.  It can be reviewed as an online document in any browser, or it can be downloaded in eBook formats or as a PDF.  Note that the template files are included as links within the online version, and all templates can be downloaded from the Appendix with Templates.  This version includes valuable updates to the Guide and Templates from Version 2.1.   A list of revisions is included on the version history page.

Quelle und weiterlesen: https://bim.psu.edu